PFD Miami
 

Walks and Drives 2019

Contract TypeCompany AwardedPrice
GENERAL ContractSchumacher Dugan $439,887.50
Notice to Proceed
Estimated Completetion
 

North Campus Parking Garage Improvements

Contract TypeCompany AwardedPrice
GENERAL ContractZSR Contracting and Restoration $248,000.00
Notice to Proceed
Estimated Completetion
 

Art Building Corridor Stairwell Reno

Contract TypeCompany AwardedPrice
GENERAL ContractFerguson Construction $364,662.00
ALT. G-1 $14,612.00
ALT. G-2 $879.00
ALT. G-3 $30,467.00
ALT. G-4 $25,800.00
ALT. G-5 $28,630.00
Notice to Proceed
Estimated Completetion
 

CPA Water Infiltration Improvements

Contract TypeCompany AwardedPrice
GENERAL ContractKramer and Feldman $203,300.00
Notice to Proceed
Estimated Completetion
 

Peabody Hall Restroom Renovation

Contract TypeCompany AwardedPrice
GENERAL ContractKramer and Feldman $284,235.00
Notice to Proceed
Estimated Completetion
 

VOA Commerce Department Renovations

Contract TypeCompany AwardedPrice
GENERAL ContractKramer and Feldman $641,297.00
ALT. G-1 $24,201.00
Notice to Proceed
Estimated Completetion
 

MacMillan Hall Basement Renovation

Contract TypeCompany AwardedPrice
GENERAL ContractKramer and Feldman $495,000.00
ALT. G-1 $18,048.00
Notice to Proceed
Estimated Completetion
 

SADC Gross Family Roof Replacement

Contract TypeCompany AwardedPrice
GENERAL ContractAEQ LLC $471,850.00
ALT. G-1 $42,240.00
ALT. G-2 -$147,610.00
Notice to Proceed
Estimated Completetion
 

ASC Center for Career Exploration and Success Phase 2

Contract TypeCompany AwardedPrice
GENERAL ContractKramer and Feldman $197,000.00
ALT. G-1 $94,500.00
Notice to Proceed
Estimated Completetion
 

UTL Feeder J Upgrade

Contract TypeCompany AwardedPrice
GENERAL ContractLake Erie Electric $811,500.00
Notice to Proceed
Estimated Completetion
 

Soccer Stadium Complex Modifications

Contract TypeCompany AwardedPrice
GENERAL ContractMegen Construction $1,168,700.00
ALT. G-1 $186,850.00
ALT. G-3 $21,910.00
ALT. G-4 $115,500.00
ALT. G-5 $37,905.00
ALT. G-6 $58,850.00
ALT. G-7 $30,450.00
Notice to Proceed
Estimated Completetion
 

Mosler Hall E-Learning Renovation

Contract TypeCompany AwardedPrice
GENERAL ContractMegen Construction $321,660.00
ALT. G-1 $6,135.00
ALT. G-2 $5,060.00
ALT. G-3 $4,766.00
Notice to Proceed
Estimated Completetion
 

Johnston Hall Career Services Renovation

Contract TypeCompany AwardedPrice
GENERAL ContractMegen Construction $321,000.00
ALT. G-1 $4,150.00
ALT. G-2 $2,000.00
ALT. G-3 $10,400.00
Notice to Proceed
Estimated Completetion
 

Yager West Partial Roof Replacement

Contract TypeCompany AwardedPrice
GENERAL ContractKelley Brothers $711,711.00
ALT. G-2 $18,750.00
ALT. G-3 $25,300.00
ALT. G-4 $17,600.00
ALT. G-5 $8,800.00
Notice to Proceed
Estimated Completetion
 

Western Tunnel Removal and Presser Bridge Rehab

Contract TypeCompany AwardedPrice
GENERAL ContractZSR Contracting and REstoration $1,435,000.00
Notice to Proceed
Estimated Completetion
 

Residence Hall Dorm Room Ventilation

Contract TypeCompany AwardedPrice
GENERAL ContractTriton Services $1,350,000.00
ALT. G-1 $149,500.00
ALT. G-2 $177,000.00
ALT. G-3 $204,000.00
Notice to Proceed
Estimated Completetion
 

Yager West Stands HVAC Upgrades 2019

Contract TypeCompany AwardedPrice
HVAC ContractTriton Services $777,600.00
ALT. M-1 $19,500.00
ALT. M-2 $49,000.00
Notice to Proceed
Estimated Completetion
 

Engineering Workshop State Route 73 Renovation 2018

Contract TypeCompany AwardedPrice
GENERAL ContractJL Kuck General Contractor $214,000.00
Notice to Proceed
Estimated Completetion
 

Campus Avenue Garage

Contract TypeCompany AwardedPrice
GENERAL ContractLithko Restoration $356,890.00
Notice to Proceed
Estimated Completetion
 

UEA Plant Security 2018

Contract TypeCompany AwardedPrice
GENERAL ContractJl Kuck General Contractor $416,973.00
Notice to Proceed
Estimated Completetion
 

RSC Sealant Replacement and Masonry Repair

Contract TypeCompany AwardedPrice
GENERAL ContractLithko Restoration $179,490.00
Notice to Proceed
Estimated Completetion
 

2018 Parking Lot and Sidewalk Improvements

Contract TypeCompany AwardedPrice
GENERAL ContractSchumacher Dugan $355,900.00
Notice to Proceed
Estimated Completetion
 

Glos Center Renovation

Contract TypeCompany AwardedPrice
GENERAL ContractSeyferth Building Company $1,232,000.00
ALT. G-2 $22,800.00
ALT. G-3 $2,600.00
ALT. G-5 $19,200.00
Notice to Proceed
Estimated Completetion
 

Wilks-Schwarm Roof Replacement

Contract TypeCompany AwardedPrice
GENERAL ContractCampopiano $703,600.00
ALT. G-1 $96,000.00
Notice to Proceed
Estimated Completetion
 

Art Building Rooms 107, 130 and 148 Renovation

Contract TypeCompany AwardedPrice
GENERAL ContractKramer & Feldman $220,165.00
Notice to Proceed
Estimated Completetion
 

Williams Hall Classroom Upgrades 2018

Contract TypeCompany AwardedPrice
GENERAL ContractKramer and Feldman $200,534.00
Notice to Proceed
Estimated Completetion
 

McGuffey Hall EHS Classroom Renovation

Contract TypeCompany AwardedPrice
GENERAL ContractBilbrey Construction $164,775.00
ALT. G-1 $1,649.00
Notice to Proceed
Estimated Completetion
 

Upham Hall Domestic Fire Service

Contract TypeCompany AwardedPrice
GENERAL ContractProgressive Plumbing $387,000.00
Notice to Proceed
Estimated Completetion
 

Hall Auditorium Built-in-Gutter Replacement and Roof Repairs

Contract TypeCompany AwardedPrice
GENERAL ContractAEQ LLC $380,100.00
ALT. G-1 $24,240.00
ALT. G-3 $16,240.00
Notice to Proceed
Estimated Completetion
 

CAB Roof Replacement

Contract TypeCompany AwardedPrice
GENERAL ContractKelley Brothers Roofing $711,188.00
ALT. G-1 $26,425.00
ALT. G-2 $29,678.00
ALT. G-3 $5,410.00
Notice to Proceed
Estimated Completetion
 

Mosler Hall Penthouse Roof Replacement 2018

Contract TypeCompany AwardedPrice
GENERAL ContractHarold J Becker Company $209,000.00
Notice to Proceed
Estimated Completetion
 

Art Building HVAC Replacement 2018 REBID - see Addendum 3 to Original Project for Rebid Bid Documents

Contract TypeCompany AwardedPrice
GENERAL ContractArtic Heating And Air $1,059.00
ALT. G-1 $19,500.00
ALT. G-2 $10,850.00
Notice to Proceed
Estimated Completetion
 

Walks and Drives 2017 Spring and Maple Intersection

Contract TypeCompany AwardedPrice
GENERAL ContractJL Kuck General Contractors $597,713.00
ALT. G-1 $17,595.00
Notice to Proceed
Estimated Completetion
 

Art Building HVAC Upgrades REBID

Contract TypeCompany AwardedPrice
GENERAL ContractProgressive Plumbing $357,500.00
ALT. G-1Progressive Plumbing $99,500.00
ALT. G-2Progressive Plumbing $15,500.00
Notice to Proceed
Estimated Completetion
 

Harrison Hall Interior Renovations Rebid

Contract TypeCompany AwardedPrice
GENERAL ContractArmcorp Construction $437,500.00
Notice to Proceed
Estimated Completetion
 

Anderson Hall Room Ventilation

Contract TypeCompany AwardedPrice
GENERAL ContractBlau Mechanical $318,000.00
Notice to Proceed
Estimated Completetion
 

Emergency Radio Responder Coverage System REBID

Contract TypeCompany AwardedPrice
GENERAL ContractMobilcomm $254,550.00
ALT. G-2 $75,510.00
Notice to Proceed
Estimated Completetion
 

Hoyt Hall Renovation

Contract TypeCompany AwardedPrice
GENERAL ContractJ.L. Kuck General Contractors $969,780.00
ALT. G-1J.L. Kuck General Contractors $40,100.00
ALT. G-2J.L. Kuck General Contractors $56,000.00
ALT. G-3J.L. Kuck General Contractors $34,506.00
ALT. G-4J.L. Kuck General Contractors $41,822.00
ALT. G-5J.L. Kuck General Contractors $8,000.00
ALT. G-6J.L. Kuck General Contractors $19,800.00
Notice to Proceed
Estimated Completetion
 

Central Quad High Voltage Electic Conversion

Contract TypeCompany AwardedPrice
GENERAL ContractWagner Industrial Electric $749,299.00
ALT. E-2
ALT. E-3Wagner Industrial Electric $15,759.00
ALT. E-4Wagner Industrial Electric $6,030.00
Notice to Proceed
Estimated Completetion
 

Farmer School of Business East Breezeway Roof Replacement

Contract TypeCompany AwardedPrice
GENERAL ContractAEQ LLC $88,300.00
Notice to Proceed
Estimated Completetion
 

Art Museum Roof Replacement 2017

Contract TypeCompany AwardedPrice
GENERAL ContractAEQ LLC $537,500.00
ALT. G-1AEQ LLC $39,000.00
Notice to Proceed
Estimated Completetion
 

Art Building Classrooms 016, 020 and 022 Renovation

Contract TypeCompany AwardedPrice
GENERAL ContractLeo J. Brielmaier $211,500.00
ALT. G-1Leo J. Brielmaier $8,400.00
ALT. G-2Leo J. Brielmaier $5,600.00
ALT. G-4Leo J. Brielmaier $2,600.00
Notice to Proceed
Estimated Completetion
 

CAB Lower Level Rehabilitation

Contract TypeCompany AwardedPrice
GENERAL ContractGraybach LLC $1,887,590.00
ALT. G-1Graybach LLC $4,775.00
ALT. G-2Graybach LLC $2,500.00
ALT. G-3Graybach LLC $16,000.00
Notice to Proceed
Estimated Completetion
 

South Refrigeration Plant Air Conditioning

Contract TypeCompany AwardedPrice
GENERAL ContractProgressive Plumbing $264,600.00
Notice to Proceed
Estimated Completetion
 

Farmer School of Business Exterior Door Replacement

Contract TypeCompany AwardedPrice
GENERAL ContractBilbrey Construction $385,600.00
ALT. G-1Bilbrey Construction $40,600.00
Notice to Proceed
Estimated Completetion
 

Yager West Renovations and Upgrades

Contract TypeCompany AwardedPrice
GENERAL ContractKramer and Feldman $412,932.00
ALT. G-1Kramer and Feldman -$1,680.00
ALT. G-3Kramer and Feldman $4,520.00
ALT. G-5Kramer and Feldman $21,840.00
OTHER ContractKramer and Feldman $5,335.00
Notice to Proceed
Estimated Completetion
 

Western Campus Bridge Rehabilitation

Contract TypeCompany AwardedPrice
GENERAL ContractZSR Contracting $1,036,000.00
ALT. G-1ZSR Contracting $20,900.00
Notice to Proceed
Estimated Completetion
 

Millett Hall Electrical Modifications Re-bid

Contract TypeCompany AwardedPrice
GENERAL ContractBanta Electrical $164,800.00
Notice to Proceed
Estimated Completetion
 

Sawyer Hall Refurbish

Contract TypeCompany AwardedPrice
GENERAL ContractKramer and Feldman $361,741.00
Notice to Proceed
Estimated Completetion
 

Havighurst Residence Hall Lighting

Contract TypeCompany AwardedPrice
GENERAL ContractCalvin Electric LLC $128,000.00
Notice to Proceed
Estimated Completetion
 

Peabody Resident Hall Lighting, Mechanical and Interior Upgrade 2016

Contract TypeCompany AwardedPrice
GENERAL ContractKramer and Feldman $470,730.00
ALT. G-1Kramer and Feldman $34,062.00
Notice to Proceed
Estimated Completetion
 

Millett Hall Partial Roof Replacement 2016

Contract TypeCompany AwardedPrice
GENERAL ContractWm Kramer and Son $1,310,100.00
ALT. G-1Wm Kramer and Son $3,500.00
ALT. G-2Wm Kramer and Son $3,600.00
ALT. G-3Wm Kramer and Son $217,500.00
Notice to Proceed
Estimated Completetion
 

Upham Hall Emergency Generator Upgrade and Unit Substation Consolidation

Contract TypeCompany AwardedPrice
GENERAL ContractLake Erie Electric $484,200.00
Notice to Proceed
Estimated Completetion
 

Irvin Hall Renovations 2016

Contract TypeCompany AwardedPrice
GENERAL ContractLeo J Brielmaier Co $353,100.00
Notice to Proceed
Estimated Completetion
 

Hughes Hall 141 and 161 Renovation

Contract TypeCompany AwardedPrice
GENERAL ContractArmcorp Corporation $585,000.00
ALT. G-1Armcorp Corporation $104,000.00
Notice to Proceed
Estimated Completetion
 

Edwards Parking Lot Reconstruction

Contract TypeCompany AwardedPrice
GENERAL ContractSchumacher Dugan Construction $340,655.00
Notice to Proceed
Estimated Completetion
 

Ogden Hall Partial Roof Replacement 2016

Contract TypeCompany AwardedPrice
GENERAL ContractThe Imbus Roofing Company $296,105.00
ALT. G-1The Imbus Roofing Company $40,955.00
ALT. G-2The Imbus Roofing Company $28,555.00
Notice to Proceed
Estimated Completetion
 

Upham Hall First Floor Renovation Academic Advising

Contract TypeCompany AwardedPrice
GENERAL ContractSeyferth Building Company $498,500.00
ALT. G-1Seyferth Building Company $4,000.00
ALT. G-2Seyferth Building Company $43,800.00
Notice to Proceed
Estimated Completetion
 

Hamilton Campus Gym Roof Replacement

Contract TypeCompany AwardedPrice
GENERAL ContractAH Sturgill Roofing $339,800.00
ALT. G-1AH Sturgill Roofing $34,800.00
ALT. G-2AH Sturgill Roofing $29,960.00
ALT. G-4AH Sturgill Roofing $16,000.00
ALT. G-5AH Sturgill Roofing $9,960.00
Notice to Proceed
Estimated Completetion
 

Miami Middletown - Harvey-Gardner Library Renovations and Upgrades

Contract TypeCompany AwardedPrice
GENERAL ContractRL Fender Construction $661,071.00
Notice to Proceed
Estimated Completetion
 

SWORD Roof Replacement 2016

Contract TypeCompany AwardedPrice
GENERAL ContractWm Kramer and Son $218,300.00
Notice to Proceed
Estimated Completetion
 

Gunlock Family Athlete Performance Center Geothermal Field

Contract TypeCompany AwardedPrice
GENERAL ContractBertram Drilling $792,667.00
ALT. G-1Bertram Drilling $3,100.00
Notice to Proceed
Estimated Completetion
 

WCR - King Library Renovation 2015

Contract TypeCompany AwardedPrice
GENERAL ContractMark Spaulding Construction $999,500.00
ALT. G-1Mark Spaulding Construction $92,000.00
ALT. G-2 $22,000.00
Notice to Proceed
Estimated Completetion
 

WCR - Chestnut Field House

Contract TypeCompany AwardedPrice
GENERAL ContractMark Spaulding Construction $500,000.00
Notice to Proceed
Estimated Completetion
 

Upham Hall Renovation 2015

Contract TypeCompany AwardedPrice
GENERAL ContractLeo J Brielmaier $259,900.00
Notice to Proceed
Estimated Completetion
 

Harris Drive Renovations

Contract TypeCompany AwardedPrice
GENERAL ContractSchumacher Dugan Construction $367,250.00
ALT. G-1Schumacher Dugan Construction $95,000.00
ALT. G-2Schumacher Dugan Construction $152,000.00
ALT. G-4Schumacher Dugan Construction $10,250.00
Notice to Proceed
Estimated Completetion
 

Central Campus Electrical Modifications II 2015

Contract TypeCompany AwardedPrice
ELECTRICAL ContractLake Erie Electric $110,665.00
Notice to Proceed
Estimated Completetion
 

Morris Hall Renovation 2015

Contract TypeCompany AwardedPrice
GENERAL ContractTri-State Renovations $662,500.00
Notice to Proceed
Estimated Completetion
 

HDRBS MEP Improvements 2015

Contract TypeCompany AwardedPrice
GENERAL ContractTri-State Renovations $747,703.00
Notice to Proceed
Estimated Completetion
 

Irvin Hall Room 040 Lecture Hall Renovation 2015

Contract TypeCompany AwardedPrice
GENERAL ContractShowcase Building and Design $123,000.00
Notice to Proceed
Estimated Completetion
 

South Chiller Plant Roof 2015

Contract TypeCompany AwardedPrice
GENERAL ContractMaxim Roofing Company $96,350.00
ALT. A-1Maxim Roofing Company $77,540.00
ALT. A-2Maxim Roofing Company $50,230.00
Notice to Proceed
Estimated Completetion
 

Bachelor Hall Roof 2015

Contract TypeCompany AwardedPrice
GENERAL ContractAEQ LLC dba Ace Exteriors $110,000.00
ALT. A-1AEQ LLC dba Ace Exteriors $22,500.00
ALT. A-2AEQ LLC dba Ace Exteriors $44,000.00
ALT. A-3AEQ LLC dba Ace Exteriors $125,000.00
Notice to Proceed
Estimated Completetion
 

Harrison Hall Room Renovations 2015

Contract TypeCompany AwardedPrice
GENERAL ContractKramer and Feldman $414,279.00
Notice to Proceed
Estimated Completetion
 

Irvin Hall Classroom Upgrades 2015

Contract TypeCompany AwardedPrice
GENERAL ContractKramer and Feldman $197,261.00
ALT. G-1Kramer and Feldman $64,029.00
Notice to Proceed
Estimated Completetion
 

Bachelor Hall Room 102 Renovation 2015

Contract TypeCompany AwardedPrice
GENERAL ContractLeo J Brielmaier $234,400.00
Notice to Proceed
Estimated Completetion
 

HC Mosler Lab and CIT Office Renovations

Contract TypeCompany AwardedPrice
GENERAL ContractMegen Construction $489,500.00
ALT. G-1Megen Construction $2,900.00
Notice to Proceed
Estimated Completetion
 

Peabody HVAC Upgrades 2015

Contract TypeCompany AwardedPrice
HVAC ContractBlau Mechanical $249,000.00
Notice to Proceed
Estimated Completetion
 

Emergency Phone Towers Phase II

Contract TypeCompany AwardedPrice
ELECTRICAL ContractRapier Electric $157,000.00
Notice to Proceed
Estimated Completetion
 

Culinary Center Rehab 2015

Contract TypeCompany AwardedPrice
GENERAL ContractI.F. Weber $710,387.00
ALT. G-1I.F. Weber $74,874.00
ALT. G-2I.F. Weber $373.00
ALT. G-4I.F. Weber $2,238.00
Notice to Proceed
Estimated Completetion
 

Millett Court Lighting

Contract TypeCompany AwardedPrice
ELECTRICAL ContractLake Erie Electric $36,385.00
Notice to Proceed
Estimated Completetion
 

CPA HVAC DDC Upgrades Phase 2

Contract TypeCompany AwardedPrice
GENERAL ContractProgressive Plumbing $529,200.00
Notice to Proceed
Estimated Completetion
 

Old Talawanda High School Demolition

Contract TypeCompany AwardedPrice
GENERAL ContractSteve Rauch, Inc. $1,368,700.00
ALT. G-1Steve Rauch, Inc. $107,870.00
ALT. G-2Steve Rauch, Inc. $38,861.00
Notice to Proceed
Estimated Completetion
 

Middletown Walks and Drives 2014

Contract TypeCompany AwardedPrice
GENERAL ContractWestside Paving $434,770.00
ALT. G-1Westside Paving $8,000.00
ALT. G-2Westside Paving $4,000.00
ALT. G-3Westside Paving $5,000.00
Notice to Proceed
Estimated Completetion
 

Demske Center and N Chiller Plant Roofs

Contract TypeCompany AwardedPrice
GENERAL ContractWm. Kramer & Son $408,600.00
Notice to Proceed
Estimated Completetion
 

Asphalt Repair and Maintenance 2014

Contract TypeCompany AwardedPrice
GENERAL ContractSchumacher Dugan $183,220.00
Notice to Proceed
Estimated Completetion
 

Kreger Hall AudioVisual Renovation

Contract TypeCompany AwardedPrice
AUDIO VISUAL ContractNor-Com, Inc. $267,990.00
Notice to Proceed
Estimated Completetion
 

Hughes Hall Roof Replacement

Contract TypeCompany AwardedPrice
GENERAL ContractR&B Contractors $627,850.00
Notice to Proceed
Estimated Completetion
 

Hub Quad Tunnel Top Replacement

Contract TypeCompany AwardedPrice
GENERAL ContractFryman Kuck $945,278.00
Notice to Proceed
Estimated Completetion
 

AQEM and CPA HVAC Renos

Contract TypeCompany AwardedPrice
HVAC ContractLake Erie Electric $600,000.00
ALT. M-1Lake Erie Electric $31,510.00
ELECTRICAL ContractLake Erie Electric $199,498.00
Notice to Proceed
Estimated Completetion
 

HDRBS MEP Improvements Summer 2014

Contract TypeCompany AwardedPrice
GENERAL ContractFrye Mechanical $475,500.00
Notice to Proceed
Estimated Completetion
 

King Library ORU 2014

Contract TypeCompany AwardedPrice
GENERAL ContractEndeavor Construction $271,700.00
ALT. G-1Endeavor Construction $26,000.00
ALT. G-2Endeavor Construction $5,000.00
ALT. G-3Endeavor Construction $2,000.00
Notice to Proceed
Estimated Completetion
 

Phelps Parrish HVAC Upgrades 2014

Contract TypeCompany AwardedPrice
HVAC ContractProgressive Plumbing $796,500.00
ALT. M-1Progressive Plumbing $53,000.00
Notice to Proceed
Estimated Completetion
 

Verity Lodge HVAC Improvements 2014

Contract TypeCompany AwardedPrice
HVAC ContractProgressive Plumbing $189,100.00
Notice to Proceed
Estimated Completetion
 

Alexander Dining Hall Deconstruction

Contract TypeCompany AwardedPrice
GENERAL ContractEvans Landscaping $329,800.00
Notice to Proceed
Estimated Completetion
 

Upham Greenhouse Demo and Landescaping

Contract TypeCompany AwardedPrice
GENERAL ContractEvans Landscaping $214,925.00
ALT. G-1Evans Landscaping $4,825.00
Notice to Proceed
Estimated Completetion
 

Presser Stormwater Pond and Formal Gardens Ponds

Contract TypeCompany AwardedPrice
GENERAL ContractOhio Irrigation $191,744.00
ALT. G-1Ohio Irrigation $42,960.00
ALT. G-2Ohio Irrigation -$2,700.00
Notice to Proceed
Estimated Completetion
 

Armstrong Student Center Graphic Signage

Contract TypeCompany AwardedPrice
GENERAL ContractGeograph Industries $195,909.00
Notice to Proceed08/23/2013
Estimated Completetion
 

Armstrong Student Center AudioVisual

Contract TypeCompany AwardedPrice
GENERAL ContractSoundcom Systems $879,811.00
ALT. G-1 $49,619.00
ALT. G-4 $15,839.00
ALT. G-5 $6,889.00
ALT. G-7 $18,927.00
Notice to Proceed
Estimated Completetion
 

MET Quad Site Improvements

Contract TypeCompany AwardedPrice
GENERAL ContractJL Kuck General Contractors $1,161,297.00
ALT. G-3 $8,000.00
ALT. G-4 $37,000.00
ALT. G-7 $16,200.00
Notice to Proceed
Estimated Completetion
 

Central Quad Tunnel Top Replacement

Contract TypeCompany AwardedPrice
GENERAL ContractMonarch Construction Company $987,000.00
ALT. G-1 $0.00
ALT. G-2 $34,000.00
ALT. G-3 $70,000.00
ALT. G-4 $4,200.00
Notice to Proceed
Estimated Completetion
 

Campus Hardscape Improvements 2013

Contract TypeCompany AwardedPrice
GENERAL ContractMonarch Construction Co. $1,737,000.00
ALT. G-1 $26,000.00
ALT. G-2 $15,000.00
ALT. G-3 $9,000.00
ALT. G-6 $2,600.00
Notice to Proceed
Estimated Completetion
 

RSC Pro Shop Renovation

Contract TypeCompany AwardedPrice
GENERAL ContractEndeavor Construction $511,000.00
ALT. G-2 $8,000.00
ALT. G-3 $6,000.00
ALT. G-4 $1,000.00
Notice to Proceed
Estimated Completetion
 

MU Summer Roofing 2013

Contract TypeCompany AwardedPrice
GENERAL ContractThe Imbus Roofing Co. $943,418.00
Notice to Proceed
Estimated Completetion
 

Peabody Hall Roof Replacement

Contract TypeCompany AwardedPrice
GENERAL ContractR & B Contractors $275,465.00
ALT. G-1 $87,500.00
Notice to Proceed
Estimated Completetion
 

Yager Stadium Steam to Gas Conversion

Contract TypeCompany AwardedPrice
GENERAL ContractProgressive Plumbing $223,000.00
ALT. M-1 $19,000.00
Notice to Proceed
Estimated Completetion
 

Bachelor Hall Elevator Renovations

Contract TypeCompany AwardedPrice
GENERAL ContractG/C Contracting Corporation $232,800.00
ALT. G-1 $22,000.00
Notice to Proceed
Estimated Completetion
 

Yager Stadium West Stands Repair Phase3

Contract TypeCompany AwardedPrice
GENERAL ContractStructureTec CSG Corporation $265,562.00
ALT. G-1 $16,375.00
ALT. G-2 $33,473.00
Notice to Proceed
Estimated Completetion
 

Hoyt Hall Fire Alarm Upgrade

Contract TypeCompany AwardedPrice
ELECTRICAL ContractCincy Electrical Solutions $73,992.00
Notice to Proceed
Estimated Completetion
 

Armstrong Student Center Landscaping

Contract TypeCompany AwardedPrice
GENERAL ContractOberson's Nursery & Landscape Inc. $144,613.00
ALT. G-1 $61,500.00
Notice to Proceed
Estimated Completetion
 

CSB Boiler Replacement

Contract TypeCompany AwardedPrice
HVAC ContractTriton Services $106,200.00
Notice to Proceed
Estimated Completetion
 

Johnston Hall Boiler No. 2 Replacement

Contract TypeCompany AwardedPrice
HVAC ContractProgressive Plumbing $86,600.00
Notice to Proceed
Estimated Completetion
 

Shriver Center Select HVAC 2012

Contract TypeCompany AwardedPrice
HVAC ContractFrye Mechanical $177,887.00
Notice to Proceed
Estimated Completetion
 

Airport Pavement Crack Repair and Sealing 2012

Contract TypeCompany AwardedPrice
GENERAL ContractAffordable Asphalt Maintenance Corp $148,579.00
ALT. G-1 $49,374.00
ALT. G-2 $20,212.00
Notice to Proceed
Estimated Completetion
 

McGuffey Hall to King Library Steam Loop

Contract TypeCompany AwardedPrice
HVAC ContractProgressive Plumbing $398,100.00
Notice to Proceed
Estimated Completetion
 

Cook Field Shelter and Restroom

Contract TypeCompany AwardedPrice
GENERAL ContractGC Contracting $350,810.00
ALT. A-1 $4,950.00
ALT. A-2 $2,750.00
ALT. A-3 $4,840.00
Notice to Proceed
Estimated Completetion
 

Bishop Hall Reno

Contract TypeCompany AwardedPrice
GENERAL ContractEndeavor Construction, LTD $5,491,000.00
ALT. G-1 $8,000.00
ALT. G-2 $43,000.00
ALT. G-3 $7,000.00
ALT. G-4 $3,000.00
Notice to Proceed
Estimated Completetion
 

Yager Stadium West Stand Repairs - Ph 2

Contract TypeCompany AwardedPrice
GENERAL ContractSuburban Maintenance $225,000.00
Notice to Proceed
Estimated Completetion
 

Western Campus Geothermal Plant Site Infrastructure

Contract TypeCompany AwardedPrice
GENERAL ContractMonarch Construction Company $11,124,000.00
ALT. M-2 $28,000.00
ALT. M-3 $74,000.00
ALT. M-4 $48,000.00
ALT. M-5 $31,000.00
ALT. M-7 $176,000.00
ALT. M-8 $59,000.00
ALT. C-1 $275,000.00
ALT. C-2 $535,000.00
ALT. A-1 $133,000.00
ALT. A-2 $5,000.00
ALT. O-1 $29,000.00
Notice to Proceed
Estimated Completetion
 

Miami Inn Renovations 2012

Contract TypeCompany AwardedPrice
GENERAL ContractElford $458,855.00
Notice to Proceed
Estimated Completetion
 

Residence Hall Upgrades 2012

Contract TypeCompany AwardedPrice
GENERAL ContractTri-State Renovations, Inc. $1,324,100.00
Notice to Proceed
Estimated Completetion
 

Cook Playfield Renovation

Contract TypeCompany AwardedPrice
GENERAL ContractSolica Construction, Inc $2,055,000.00
ALT. G-1 $25,700.00
ALT. G-4 $8,500.00
ALT. G-5 $14,500.00
ALT. G-6 $36,000.00
Notice to Proceed
Estimated Completetion
 

Thomson Roof Replacement

Contract TypeCompany AwardedPrice
GENERAL ContractWm. Kramer & Son, Inc $290,800.00
Notice to Proceed
Estimated Completetion
 

Maplestreet Site Infrastructure

Contract TypeCompany AwardedPrice
GENERAL ContractJ.L. Kuck General Contractors, Inc. $2,198,000.00
ALT. G-1 $49,743.00
ALT. M-1 $13,650.00
ALT. E-1 $8,937.00
Notice to Proceed
Estimated Completetion
 

Walks & Drives 2012

Contract TypeCompany AwardedPrice
GENERAL Contract $237,145.00
ALT. G-1 $31,300.00
ALT. G-2 $37,495.00
Notice to Proceed
Estimated Completetion
 

RSC Partial Roof Replacement

Contract TypeCompany AwardedPrice
GENERAL ContractWm. Kramer & Son, Inc. $400,950.00
ALT. G-3 -$30,650.00
Notice to Proceed
Estimated Completetion
 

Western Campus Electrical Modifications

Contract TypeCompany AwardedPrice
ELECTRICAL ContractLake Erie Electric, Inc. $412,600.00
ALT. E-1 $12,300.00
ALT. E-2 $4,200.00
Notice to Proceed
Estimated Completetion
 

CSC Emergency Generator

Contract TypeCompany AwardedPrice
GENERAL ContractJohn P. Tumlin & Sons Ltd. $35,310.00
ELECTRICAL ContractAC Electrical Systems $269,990.00
Notice to Proceed
Estimated Completetion
 

King Library Emergency Generator Upgrade

Contract TypeCompany AwardedPrice
GENERAL ContractJohn P. Tumlin & Sons Ltd $15,800.00
HVAC ContractProgressive Plumbing Company $167,500.00
ELECTRICAL ContractAC Electrical Systems $77,350.00
Notice to Proceed
Estimated Completetion
 

Steam Plant MCC Replacement

Contract TypeCompany AwardedPrice
ELECTRICAL ContractWagner Industrial Electric, Inc. $174,900.00
ALT. E-2 $2,900.00
ALT. E-4 $8,800.00
Notice to Proceed
Estimated Completetion
 

Shideler Fume Hood Exhaust Renovation

Contract TypeCompany AwardedPrice
HVAC ContractFrye Mechanical $63,568.00
ALT. M-1 $1,559.00
ELECTRICAL ContractCalvin Electric $8,880.00
ALT. E-1 $1,995.00
Notice to Proceed
Estimated Completetion
 

Maplestreet Station Residence and Dining Hall

Contract TypeCompany AwardedPrice
GENERAL ContractThe Quandel Group $12,689,149.00
ALT. G-1 $192,000.00
ALT. G-2 $58,500.00
ALT. G-3 $69,200.00
ALT. G-4 $37,000.00
PLUMBING ContractQueen City Mechanicals, Inc. $1,155,000.00
ALT. P-1 $0.00
ALT. P-2 $5,500.00
FIRE PROTECTION ContractS.A. Communale, Inc. $216,996.00
HVAC ContractGM Mechanical, Inc. $2,625,000.00
ELECTRICAL ContractRapier Electric, Inc. $2,677,000.00
ALT. E-1 $36,100.00
ALT. E-2 $7,140.00
Notice to Proceed
Estimated Completetion
 

Central Campus Chilled Water

Contract TypeCompany AwardedPrice
HVAC ContractBlau Mechanical $994,000.00
ALT. M-1 $3,000.00
ALT. M-2 $12,000.00
ALT. M-3 $24,000.00
ELECTRICAL ContractCincy Electrical $46,900.00
ALT. E-1 $9,000.00
ALT. E-2 $26,000.00
Notice to Proceed
Estimated Completetion
 

Millett Emergency Generator and Lighting Upgrades

Contract TypeCompany AwardedPrice
ELECTRICAL ContractCincy Electrical Solutions $152,800.00
Notice to Proceed
Estimated Completetion
 

Tennis Courts Resurfacing

Contract TypeCompany AwardedPrice
GENERAL ContractWestside Paving and Excavating, Inc. $162,690.00
Notice to Proceed
Estimated Completetion
 

Armstrong Student Center

Contract TypeCompany AwardedPrice
GENERAL ContractMonarch Construction Company $24,977,000.00
PLUMBING ContractDriekast Piping $1,776,000.00
ALT. P-1 $5,000.00
FIRE PROTECTION ContractDalmatian Fire Protection $427,000.00
ALT. F-1 $10,000.00
HVAC ContractTriton Services, Inc. $6,318,000.00
ELECTRICAL ContractESI, Inc. $4,196,540.00
ALT. E-1 $258,000.00
ALT. E-3 $11,000.00
Notice to Proceed
Estimated Completetion
 

Williams Hall Roof Replacement 2011

Contract TypeCompany AwardedPrice
GENERAL ContractR and B Contractors $335,600.00
Notice to Proceed
Estimated Completetion
 

Steam Plant Storm and Sanitary Improvements

Contract TypeCompany AwardedPrice
PLUMBING Contract $141,025.00
Notice to Proceed
Estimated Completetion
 

Finkelman Auditoriu Renovation 2011

Contract TypeCompany AwardedPrice
GENERAL ContractKramer & Feldman $1,418,429.00
ALT. G-1 $1,356.00
ALT. G-2 $17,479.00
ALT. G-3 $26,280.00
PLUMBING ContractJMW Plumbing LLC $149,000.00
ALT. P-1 $1,000.00
FIRE PROTECTION ContractEckert Fire Protection $21,568.00
HVAC ContractProgressive Plumbing Company $71,900.00
ELECTRICAL ContractESI $106,700.00
ALT. E-1 $37,300.00
Notice to Proceed
Estimated Completetion
 

Gaskill Hall Interior Demolition

Contract TypeCompany AwardedPrice
GENERAL ContractA & M Contracting Ink $265,000.00
Notice to Proceed
Estimated Completetion
 

Shriver Center Partial Roof Replacement Phase 2

Contract TypeCompany AwardedPrice
GENERAL ContractA.W. Farrell & Sons, Inc. $93,890.00
Notice to Proceed
Estimated Completetion
 

Hamilton Hall Roof Repairs

Contract TypeCompany AwardedPrice
GENERAL ContractA.W. Farrell & Sons, Inc. $112,400.00
ALT. G-1 $7,400.00
Notice to Proceed
Estimated Completetion
 

Yager Stadium West Stands Concrete Repair

Contract TypeCompany AwardedPrice
GENERAL ContractLithko Resoration Technologies, LLC $191,970.00
Notice to Proceed
Estimated Completetion
 

Hughes Hall A Lab Audio Visual Project

Contract TypeCompany AwardedPrice
AUDIO VISUAL Contract $99,881.00
Notice to Proceed
Estimated Completetion
 

Erickson Dining Hall Dishwasher Equipment Replacement

Contract TypeCompany AwardedPrice
GENERAL Contract $70,193.00
ALT. G-1 -$999.00
Notice to Proceed
Estimated Completetion
 

HC Phelps Hall Theatre Classroom 307 Renovation REBID

Contract TypeCompany AwardedPrice
GENERAL Contract $22,959.00
HVAC Contract $23,050.00
Notice to Proceed
Estimated Completetion
 

Gaskill and Rowan Halls Asbestos Abatement

Contract TypeCompany AwardedPrice
ASBESTOS Contract $63,000.00
Notice to Proceed
Estimated Completetion
 

HC Student Parking Lot Renovation

Contract TypeCompany AwardedPrice
GENERAL Contract $554,365.00
ALT. G-1 $26,250.00
ALT. G-2 $48,950.00
ALT. G-3 $144,500.00
ELECTRICAL Contract $103,249.00
Notice to Proceed
Estimated Completetion
 

Laws Hall Rehabilititation Audio Visual Upgrades

Contract TypeCompany AwardedPrice
OTHER Contract $91,227.62
ALT. O-1 $6,673.11
ALT. O-2 $26,095.47
Notice to Proceed
Estimated Completetion
 

Hughes Hall Energy Recovery

Contract TypeCompany AwardedPrice
HVAC Contract $412,896.00
ALT. M-2 $30,000.00
ELECTRICAL Contract $46,747.00
ALT. E-2 $1,500.00
Notice to Proceed
Estimated Completetion
 

Mary Lyons, Ogden and Porter Halls Electrical Improvements

Contract TypeCompany AwardedPrice
ELECTRICAL Contract $731,400.00
Notice to Proceed
Estimated Completetion
 

Residence Hall Door Replacement

Contract TypeCompany AwardedPrice
GENERAL Contract $179,859.00
Notice to Proceed
Estimated Completetion
 

Upham Hall Teaching Lab

Contract TypeCompany AwardedPrice
GENERAL Contract $115,300.00
ALT. G-1 $26,000.00
ALT. G-2 $1,000.00
HVAC Contract $0.00
ELECTRICAL Contract $47,000.00
Notice to Proceed
Estimated Completetion
 

CPA Stage Lift

Contract TypeCompany AwardedPrice
GENERAL Contract $184,800.00
ELECTRICAL Contract $11,841.00
Notice to Proceed
Estimated Completetion
 

Relocated Band Field

Contract TypeCompany AwardedPrice
GENERAL ContractByrco, Inc. $34,725.00
ALT. G-1 $28,305.00
Notice to Proceed
Estimated Completetion
 

Elliott and Stoddard Asbestos Abatement

Contract TypeCompany AwardedPrice
OTHER Contract $74,000.00
Notice to Proceed
Estimated Completetion
 

Summer Painting 2011 - Pines Hall

Contract TypeCompany AwardedPrice
OTHER Contract $47,500.00
Notice to Proceed
Estimated Completetion
 

Harris Hall Elevator Upgrades

Contract TypeCompany AwardedPrice
GENERAL Contract $38,578.00
ALT. G-1 $177,600.00
ELECTRICAL Contract $6,632.00
ALT. E-1 $1,686.00
OTHER Contract $59,826.00
ALT. O-1 $36,000.00
Notice to Proceed
Estimated Completetion
 

Marcum Conference Center Addition-Renovation

Contract TypeCompany AwardedPrice
GENERAL Contract $2,893,380.00
PLUMBING Contract $324,000.00
FIRE PROTECTION Contract $147,500.00
HVAC Contract $528,768.00
ELECTRICAL Contract $820,400.00
Notice to Proceed
Estimated Completetion
 

Harris Dining Hall HVAC Replacement REBID

Contract TypeCompany AwardedPrice
PLUMBING Contract $187,548.00
ALT. P-1 $6,131.00
ALT. P-2 $1,600.00
HVAC Contract $1,017,000.00
ALT. M-1 $19,000.00
ALT. M-3 $13,500.00
ALT. M-4 $32,000.00
ELECTRICAL Contract $111,750.00
ALT. E-2 $1,075.00
Notice to Proceed
Estimated Completetion
 

Morris Hall Bathroom Sink Improvements

Contract TypeCompany AwardedPrice
GENERAL Contract $40,679.00
PLUMBING Contract $15,900.00
Notice to Proceed
Estimated Completetion
 

Morris Emerson and Tappan Halls Fire Suppression and Electrical Upgrades

Contract TypeCompany AwardedPrice
FIRE PROTECTION Contract $665,000.00
ELECTRICAL Contract $1,300,000.00
Notice to Proceed
Estimated Completetion
 

HC Phelps Hall Theatre Classroom 307 Renovation

Contract TypeCompany AwardedPrice
GENERAL Contract $22,959.00
HVAC Contract $23,050.00
ELECTRICAL Contract $12,749.00
Notice to Proceed
Estimated Completetion
 

HC Computing Services Renovation 3rd Floor Mosler Hall

Contract TypeCompany AwardedPrice
GENERAL Contract $74,500.00
HVAC Contract $56,500.00
ELECTRICAL Contract $25,854.00
Notice to Proceed
Estimated Completetion
 

Elliott and Stoddard Renovations

Contract TypeCompany AwardedPrice
GENERAL ContractMesser Construction $1,984,000.00
FIRE PROTECTION ContractS.A. Comunale $115,000.00
HVAC ContractDriekast Piping $1,250,000.00
ELECTRICAL ContractESI Electrical $730,000.00
Notice to Proceed
Estimated Completetion
 

Harris Dining Hall Serving Line Renovation

Contract TypeCompany AwardedPrice
GENERAL Contract $284,700.00
PLUMBING Contract $18,100.00
ELECTRICAL Contract $74,700.00
ALT. E-1 $4,815.00
Notice to Proceed
Estimated Completetion
 

Verity Lodge Improvements 2011

Contract TypeCompany AwardedPrice
GENERAL Contract $157,208.00
Notice to Proceed
Estimated Completetion
 

Main Steam Line Expansion Joint Replacement

Contract TypeCompany AwardedPrice
HVAC Contract $137,800.00
Notice to Proceed
Estimated Completetion
 

Havighurst Hall HVAC Improvements

Contract TypeCompany AwardedPrice
PLUMBING Contract $0.00
ALT. P-1 $21,907.00
ALT. P-2 $2,314.00
FIRE PROTECTION Contract $208,850.00
HVAC Contract $1,164,721.00
ALT. M-1 $13,606.00
ALT. M-4 $15,695.00
ALT. M-5 $6,210.00
ALT. M-6 $10,100.00
ALT. M-7 $21,800.00
ALT. E-2 $2,600.00
Notice to Proceed
Estimated Completetion
 

HC Mosler Hall Ceiling Replacement

Contract TypeCompany AwardedPrice
GENERAL Contract $162,959.00
HVAC Contract $268,100.00
ELECTRICAL Contract $212,648.00
Notice to Proceed
Estimated Completetion
 

Hughes Hall A Laboratory Renovations

Contract TypeCompany AwardedPrice
GENERAL ContractDAG Construction $336,217.00
PLUMBING ContractJMW Plumbing $304,700.00
FIRE PROTECTION ContractSimplex Grinnell $16,399.00
HVAC ContractFeldkamp Enterprises $216,900.00
ELECTRICAL ContractDaytep Inc $122,363.00
Notice to Proceed
Estimated Completetion
 

Hughes Steam Line Replacement

Contract TypeCompany AwardedPrice
HVAC ContractDrie-kast Piping Corp. $78,800.00
Notice to Proceed
Estimated Completetion
 

Shriver Steam Line Replacement

Contract TypeCompany AwardedPrice
HVAC ContractProgressive Plumbing Company $105,000.00
Notice to Proceed
Estimated Completetion
 

McGuffey Steam Line Replacement

Contract TypeCompany AwardedPrice
HVAC ContractTriton Services, Inc. $417,960.00
Notice to Proceed
Estimated Completetion
 

Hughes Hall Still Replacement

Contract TypeCompany AwardedPrice
PLUMBING ContractJMW Plumbing $600.00
ALT. P-2JMW Plumbing $117,500.00
ELECTRICAL ContractCincy Electrical Solutions LLC $6,390.00
ALT. E-1Cincy Electrical Solutions LLC $600.00
Notice to Proceed01/10/2011
Estimated Completetion120 days
 

Shriver Center Bookstore Renovation

Contract TypeCompany AwardedPrice
GENERAL ContractSeyferth Building Company $338,478.00
PLUMBING ContractDriekast Piping $0.00
HVAC ContractDriekast Piping $87,500.00
ELECTRICAL ContractRapier Electric $184,950.00
Notice to Proceed11/17/2010
Estimated Completetion06/30/2011
 

Phillips Art Center

Contract TypeCompany AwardedPrice
GENERAL ContractJ L Kuck General Contractors Inc $887,918.00
PLUMBING ContractJMW Plumbing $55,800.00
FIRE PROTECTION ContractPreferred Fire Protection $31,950.00
HVAC ContractArtic Heating and Air Conditioning Inc $653,780.00
ELECTRICAL ContractCincy Electrical Solutions LLC $179,500.00
Notice to Proceed11/22/2010
Estimated Completetion07/15/2011
 

Campus Avenue Building South Facade Masonry Replacement

Contract TypeCompany AwardedPrice
OTHER ContractQuality Masonry Company $171,050.00
Notice to Proceed09/27/2010
Estimated Completetion01/27/2011
 

Central Campus Electrical Modifications

Contract TypeCompany AwardedPrice
GENERAL ContractTriad Construction $106,250.00
ELECTRICAL ContractWagner Smith Company $2,350,000.00
Notice to Proceed
Estimated Completetion
 

Central Campus Water and Sewer Improvements

Contract TypeCompany AwardedPrice
OTHER ContractWelsh Excavation Inc. $1,043,003.25
Notice to Proceed09/01/2010
Estimated Completetion97 days
 

SEAS BioEngineering Lab

Contract TypeCompany AwardedPrice
GENERAL ContractTriad Construction $58,268.00
HVAC ContractProgressive Plumbing $19,590.00
ELECTRICAL ContractGann Electric $4,093.00
Notice to Proceed
Estimated Completetion
 

Withrow Court Fire Alarm Upgrade

Contract TypeCompany AwardedPrice
ELECTRICAL ContractDaytep Construction $47,800.00
Notice to Proceed09/13/2010
Estimated Completetion120 days
 

HC Rentschler Hall Second Floor Renovation Audio Visual

Contract TypeCompany AwardedPrice
OTHER ContractNor Com $45,963.00
Notice to Proceed
Estimated Completetion
 

Upham Hall North Wing Audio Visual

Contract TypeCompany AwardedPrice
OTHER ContractFrontier MEdia Solutions $83,715.00
Notice to Proceed
Estimated Completetion
 

Havighurst Hall Basement Renovation

Contract TypeCompany AwardedPrice
GENERAL ContractDaytep Construction $119,138.00
HVAC ContractMechanical Dimensions Inc. $22,390.00
ELECTRICAL ContractGann Electric Inc. $40,750.00
Notice to Proceed06/03/2010
Estimated Completetion08/13/2010
 

Shriver Center Main Entry Sidewalk and Curb Replacement

Contract TypeCompany AwardedPrice
GENERAL ContractHendy Inc $34,992.00
Notice to Proceed
Estimated Completetion
 

HC Rentschler Hall Second Floor Renovation

Contract TypeCompany AwardedPrice
GENERAL ContractSeyferth Building Company $297,743.00
FIRE PROTECTION ContractDalmation Fire $112,850.00
HVAC ContractProgressive Plumbing Company $103,100.00
ELECTRICAL ContractLake Erie Electric $129,300.00
Notice to Proceed
Estimated Completetion
 

Walks and Drives 2010 Sundial to Spring Street

Contract TypeCompany AwardedPrice
GENERAL ContractFryman Kuck General Contractor $306,240.00
Notice to Proceed
Estimated Completetion
 

Shriver Center Multi Purpose Rooms AV Upgrades

Contract TypeCompany AwardedPrice
OTHER ContractNor Com $60,422.00
ALT. O-1Nor Com $6,798.00
Notice to Proceed
Estimated Completetion
 

Summer Painting 2010 EandG Two Buildings

Contract TypeCompany AwardedPrice
OTHER ContractW.F. Bolin Company $28,455.00
OTHER ContractE.B. Miller Company $59,500.00
Notice to Proceed
Estimated Completetion
 

Miami Inn HVAC Improvements

Contract TypeCompany AwardedPrice
HVAC ContractProgressive Plumbing $351,000.00
ELECTRICAL ContractRapier Electric $15,100.00
Notice to Proceed
Estimated Completetion
 

HC Gym and Phelps Emergency Generator

Contract TypeCompany AwardedPrice
ELECTRICAL ContractLake Erie Electric, Inc. $56,998.00
Notice to Proceed
Estimated Completetion
 

MC Audio Visual Upgrades Summer 2010

Contract TypeCompany AwardedPrice
OTHER ContractAVI SPL $148,041.00
Notice to Proceed
Estimated Completetion
 

Campus Street Lighting Upgrade

Contract TypeCompany AwardedPrice
ELECTRICAL ContractAmerilect, Inc. $82,900.00
Notice to Proceed
Estimated Completetion
 

Phillips Hall Partial Roof Replacement

Contract TypeCompany AwardedPrice
GENERAL ContractCampopiano Roofing, Inc. $377,800.00
Notice to Proceed
Estimated Completetion
 

Shriver Center Partial Roof Replacement

Contract TypeCompany AwardedPrice
GENERAL ContractKerkan Roofing, Inc. $326,400.00
Notice to Proceed
Estimated Completetion
 

HC Audio Visual Upgrades Summer 2010

Contract TypeCompany AwardedPrice
OTHER ContractFrontier Media $167,995.00
Notice to Proceed05/10/2010
Estimated Completetion96 days
 

Oxford Campus Miscellaneous Waterlines High Street Water Main Improvements

Contract TypeCompany AwardedPrice
GENERAL ContractRapier Electric $56,725.20
Notice to Proceed06/21/2010
Estimated Completetion42 days
 

Steam Plant Sanitary Sewer Improvements

Contract TypeCompany AwardedPrice
GENERAL ContractUnited Infrastructure $53,415.00
Notice to Proceed
Estimated Completetion
 

Harrison hall Elevator Upgrade

Contract TypeCompany AwardedPrice
GENERAL ContractOberle and Associates $49,000.00
OTHER ContractAbell Elevator $125,356.00
Notice to Proceed05/24/2010
Estimated Completetion120 days
 

Steam Plant Stack Lining

Contract TypeCompany AwardedPrice
GENERAL ContractGibralter Chinmey International $154,400.00
Notice to Proceed
Estimated Completetion
 

Summer Painting

Contract TypeCompany AwardedPrice
OTHER ContractW.F. Bolin $288,400.00
OTHER ContractBrian Brothers $67,999.00
Notice to Proceed
Estimated Completetion
 

Hamilton and MacCracken Halls Heating Systems Improvements

Contract TypeCompany AwardedPrice
PLUMBING ContractQueen City Mechanicals $54,300.00
PLUMBING ContractQueen City Mechanicals $55,400.00
Notice to ProceedApril 26, 2010
Estimated CompletetionAugust 6, 2010
 

Marcum Conference Center Fire Alarm Upgrade

Contract TypeCompany AwardedPrice
ELECTRICAL ContractCincy Electrical Services, LLC $54,200.00
Notice to Proceed03/18/2010
Estimated Completetion66 days
 

Laws Hall Rehabilitation Phase 1

Contract TypeCompany AwardedPrice
GENERAL ContractGC Contracting $1,634,700.00
PLUMBING ContractJMW Plumbing Company $254,500.00
FIRE PROTECTION ContractQuality Fire Protection $118,200.00
HVAC ContractArtic Heating and Air $768,695.00
ELECTRICAL ContractRapier Electric $661,500.00
Notice to Proceed
Estimated Completetion
 

Erickson Hall Grease Interceptor

Contract TypeCompany AwardedPrice
PLUMBING ContractProgressive Plumbing $79,600.00
Notice to Proceed
Estimated Completetion
 

Western Steam Loop Connections Phase 3

Contract TypeCompany AwardedPrice
GENERAL ContractFryman Kuck General Contractors, Inc. $941,746.00
PLUMBING ContractJMW Plumbing $80,000.00
HVAC ContractPeck Hannaford & Briggs $250,980.00
ELECTRICAL ContractChapel Electric Company $52,558.00
Notice to Proceed
Estimated Completetion
 

CPA AH 1 and AH 3 Air Handlers Modifications

Contract TypeCompany AwardedPrice
HVAC ContractFeldkamp Enterprises, Inc. $149,850.00
ELECTRICAL ContractButler County Electric $6,875.00
Notice to Proceed
Estimated Completetion
 

Upham Hall North Wing Rehabilitation

Contract TypeCompany AwardedPrice
ALT. G-1Oberle & Associates $1,215,000.00
PLUMBING ContractDriekast Piping Corp $129,000.00
FIRE PROTECTION ContractQuality Fire Protection $45,500.00
HVAC ContractTriton Services $453,624.00
ELECTRICAL ContractRapier Electric $245,000.00
Notice to Proceed
Estimated Completetion
 

Alumni Hall Partial Roof Replacement

Contract TypeCompany AwardedPrice
GENERAL ContractWm Kramer And Sons $229,270.00
PLUMBING ContractProgressive Plumbing $15,800.00
Notice to Proceed09/23/2009
Estimated Completetion90 days
 

Steam Plant Partial Reroof

Contract TypeCompany AwardedPrice
GENERAL ContractKerkan Roofing, Inc. $146,750.00
Notice to Proceed09/21/2009
Estimated Completetion11/10/2009
 

Cole Service Building Emergency Generator

Contract TypeCompany AwardedPrice
ELECTRICAL ContractRapier Electric $74,800.00
Notice to Proceed08/21/2009
Estimated Completetion11/30/2009
 

Steam Plant Coal Bunker Number 3 Upgrade

Contract TypeCompany AwardedPrice
GENERAL ContractOrbit Sheet Metal $58,900.00
Notice to Proceed
Estimated Completetion
 

Phelps Hall Boiler Replacement

Contract TypeCompany AwardedPrice
HVAC ContractBlau Mechanical $72,800.00
Notice to Proceed
Estimated Completetion
 

HC Phelps Hall PArrish Auditorium Roof Replacement

Contract TypeCompany AwardedPrice
OTHER ContractNeibert Enterprises $265,000.00
Notice to Proceed
Estimated Completetion
 

HC Mosler Hall Plaza Renovation

Contract TypeCompany AwardedPrice
GENERAL ContractBrookside Construction $555,856.00
ELECTRICAL ContractWhalen Electric $59,508.00
Notice to Proceed
Estimated Completetion
 

Richard Hall Roof Repair Replacement

Contract TypeCompany AwardedPrice
GENERAL ContractImbus Roofing Company $195,549.00
Notice to Proceed
Estimated Completetion
 

CPA Renovations AREA E

Contract TypeCompany AwardedPrice
GENERAL ContractButler County Electric $53,382.00
PLUMBING ContractProgressive Plumbing $0.00
FIRE PROTECTION ContractQuality Fire Protection $12,250.00
HVAC ContractProgressive Plumbing $42,800.00
ELECTRICAL ContractWhalen Electric $16,025.00
Notice to Proceed
Estimated Completetion
 

Pearson Hall Closed Circuit Cooling Tower Replacement

Contract TypeCompany AwardedPrice
HVAC ContractProgressive Plumbing $39,700.00
Notice to Proceed
Estimated Completetion
 

Johnston Hall Fire Alarm Improvements

Contract TypeCompany AwardedPrice
ELECTRICAL ContractWhalen Electric $57,737.00
Notice to Proceed
Estimated Completetion
 

Pearson Hall Roof and Exhaust Replacement

Contract TypeCompany AwardedPrice
GENERAL ContractA.W. Farrell and Son, Inc. $729,800.00
ELECTRICAL ContractRapier $58,900.00
Notice to Proceed
Estimated Completetion
 

East Quad Roads and Walk Upgrade

Contract TypeCompany AwardedPrice
GENERAL ContractMainline Road and Bridge $1,428,000.00
ELECTRICAL ContractElex, Inc. $167,100.00
Notice to Proceed
Estimated Completetion
 

Marcum Steam Line Replacement

Contract TypeCompany AwardedPrice
HVAC ContractProgressive Plumbing $219,400.00
Notice to Proceed
Estimated Completetion
 

Johnston Hall Carpet Teplacement

Contract TypeCompany AwardedPrice
OTHER ContractDeGeorge Ceiling and Flooring $45,900.00
Notice to Proceed
Estimated Completetion
 

Yager Stadium West Stands Air Conditioning Unit Upgrades Phase II

Contract TypeCompany AwardedPrice
GENERAL ContractButler County Electric $29,699.00
Notice to Proceed
Estimated Completetion
 

Johnston Hall 2nd Floor Renovation

Contract TypeCompany AwardedPrice
GENERAL ContractButler County Electric $98,770.00
Notice to Proceed
Estimated Completetion
 

HC 200 Mosler Hall Classroom Renovation

Contract TypeCompany AwardedPrice
GENERAL ContractButler County Electric $81,090.00
FIRE PROTECTION ContractDlamatian Fire Protection $7,100.00
HVAC ContractProgressive Plumbing $16,200.00
ELECTRICAL ContractVolk Electrical Contractors $27,622.00
Notice to Proceed
Estimated Completetion
 

Thesken 2nd Floor Renovation

Contract TypeCompany AwardedPrice
GENERAL ContractButler County Electric $114,270.00
Notice to Proceed
Estimated Completetion
 

WC Duck Pond Bridge Renovation

Contract TypeCompany AwardedPrice
GENERAL ContractCR&R, Inc. $401,000.00
Notice to Proceed
Estimated Completetion
 

Phillips Hall Elevator Upgrade

Contract TypeCompany AwardedPrice
OTHER ContractAbell $57,907.00
Notice to Proceed
Estimated Completetion
 

Flower Hall HVAC Improvements

Contract TypeCompany AwardedPrice
PLUMBING ContractProgressive Plumbing $57,100.00
ALT. P-1Progressive Plumbing $53,200.00
HVAC ContractBlau Mechanical $510,000.00
ALT. M-1Blau Mechanical $20,700.00
ALT. M-2Blau Mechanical $8,900.00
ELECTRICAL ContractButler County Electric $68,224.00
Notice to Proceed
Estimated Completetion
 

Miami University Airport Installation of AWOS III PT

Contract TypeCompany AwardedPrice
ELECTRICAL ContractLudwig Contracting $148,619.00
ALT. E-1Ludwig Contracting $3,600.00
Notice to Proceed
Estimated Completetion
 

CPA Interior Renovations Area D

Contract TypeCompany AwardedPrice
GENERAL ContractSeyferth Building Company $65,764.00
PLUMBING ContractProgressive Plumbing $0.00
HVAC ContractProgressive Plumbing $19,400.00
ELECTRICAL ContractRapier Electric $16,000.00
Notice to Proceed
Estimated Completetion
 

Pearson Hall Laboratory Renovations

Contract TypeCompany AwardedPrice
GENERAL ContractTriad Construction $750,100.00
PLUMBING ContractKenneth R Rogers Plumbing $175,649.00
FIRE PROTECTION ContractS.A. Comunale $22,575.00
HVAC ContractGM Mechanical $279,800.00
ALT. E-1Butler County Electric $176,993.00
ALT. O-1Data Cabling Solutions $25,431.00
Notice to Proceed02/29/2009
Estimated Completetion11/30/2009
 

Johnston Hall Roof Replacement

Contract TypeCompany AwardedPrice
GENERAL ContractC.A. Eckstein $521,904.00
Notice to Proceed
Estimated Completetion
 

Thesken Hall Elevator Upgrade

Contract TypeCompany AwardedPrice
OTHER ContractAdvanced Elevator Company $119,750.00
Notice to Proceed
Estimated Completetion
 

CAB Rm 125T Air Condition and Power Upgrade Project

Contract TypeCompany AwardedPrice
Notice to Proceed
Estimated Completetion
 

Western Campus 12 KV Extension

Contract TypeCompany AwardedPrice
ELECTRICAL ContractDeBra Kuempel Company $289,000.00
Notice to Proceed
Estimated Completetion
 

MUM Lower Campus Drainage Correction

Contract TypeCompany AwardedPrice
ALT. G-1SK Construction $445,194.00
Notice to Proceed
Estimated Completetion
 

Pearson Plaza Renovation

Contract TypeCompany AwardedPrice
GENERAL ContractR.A. Miller $322,000.00
ELECTRICAL ContractRapier Electric $23,572.00
Notice to Proceed
Estimated Completetion
 

Steam Plant Boiler Feedwater Pump System Replacement

Contract TypeCompany AwardedPrice
HVAC ContractDeBra Kuempel Company $138,500.00
ELECTRICAL ContractLake Erie Electric $13,120.00
Notice to Proceed
Estimated Completetion
 

Airport Improvements - Partial Parallel Taxiway Lighting

Contract TypeCompany AwardedPrice
ELECTRICAL ContractBansal Construction $41,939.26
Notice to Proceed
Estimated Completetion
 

Art Museum Chiller Replacement

Contract TypeCompany AwardedPrice
HVAC ContractPeck Hannaford & Briggs $97,400.00
ALT. M-1Peck Hannaford & Briggs $10,100.00
ALT. M-2Peck Hannaford & Briggs $3,670.00
ELECTRICAL ContractRapier Electric $6,848.00
ALT. E-1Rapier Electric $2,600.00